My Campus app
If you haven't downloaded the Mitt Campus app yet, we recommend that you do so. There we regularly update with information that can be good to have in everyday life and things that do not have time to be included in these mailings that come out every two weeks.
Outdoor environment
We continue the work of preparing the outdoor environment for winter, which includes picking up leaves and deploying plowshares. We also continue to work on troubleshooting the outdoor lighting around Tekniktorget, Teknikens Hus parking areas and the parking lot next to Studenternas Hus. During week 45 and week 46, we will carry out work at the Pussen area where we prune trees and prepare for future measures in the area.
House A
During the next few weeks, some electrical work will be carried out in the basement. During these works, access may be limited at certain times. In the stairwell A1541, less work remains with plastering and painting the wall.
House Alpha
Tuesday 5/11 we will carry out work on the elevator in the building. During this time, the elevator will not be able to be used, and we refer to the elevators in House A and House Alf.
In Alfahuset, we work with our plumbing contractor to fix howling noises in certain toilet groups and water pipes.
House Alf
In room A273, work will be carried out starting in week 45 and will run provisionally until week 46. In connection with this, some disturbing moments may occur.
House Beta
We will carry out some work in the building. Information about this will be updated continuously.
House E
Lighting measures are underway in corridors and offices facing Regnbågsallén. During this period, disturbing sounds and other moments may occur when our electrical contractor needs access to the premises.
House F
During week 45, the move of Pavilion R is expected to be completed. After that, there remains some ground work and minor interior work in the house. Inside, we will carry out painting work in parts of the building. On Monday 11/11 between 06:30-07:30 we are carrying out work, which means that some premises will be without power. Affected businesses are informed.
House K
At the beginning of November, new external solar shading is installed. In connection with this, certain disturbances may occur in the business due to the presence of the contractor and possibly disturbing noise.