Earthworks on the LTH Campus will continue until Christmas.
In week 45, the areas around the Hub and in front of IKDC will be started. At IKDC, bicycle racks are made in two stages. There will always be a limited number of places available. See attached drawing.
Use another entrance to Navet in the meantime and park your bike in the bike racks that are available