Project information no. 3 - Reconstruction of Carpenter's shed
BUILDING INFORMATION APRIL-JUNE, 2024 Project information no. 3 - Reconstruction of Carpenter's shed Week 16–17, 2024 On Friday (12/4) assembly of the frame and roof construction began, which is expected to last a few days into week 17. Note! Assembly of the frame and roof structure means that crane trucks will be around the workplace. Week 17–22, 2024 Roof work and installation of the facade will continue in parallel during the months of April and May. Week 23–25, 2024 In the month of June, land restoration will be carried out in parallel such as the installation of gates and doors, moldings around windows and minor exterior work. Note! Restoration of land means that machines will be around the workplace. Background In August 2020, Byggnad 66 Snickarboden in Alnarp was completely destroyed in connection with a fire. After the fire, only the two concrete shelters remain. The carpentry shed is rebuilt as far as possible to its original appearance. On the ground floor, the two existing shelters are restored, a preparation for the future establishment of a switchgear and a larger heated storage room. The attic will be used as an unheated storage room.This text has been automatically translated, and some inaccuracies may be present.